Westland Nurseries (Offenham) Ltd
Evesham, Worcestershire

- Project management, design and development
- Site levelling
- Glasshouse (18,547.2m2 ) comprising:-
-
3 no. growing zones 16,257.6m2
-
Work area & boiler house 1,944.0m2
-
Irrigation room 345.6m2
- High level and under bench heating systems running off 2 no. gas fired boilers
- 3,400m2 of concrete floors, paths and tank bases
- Automated irrigation system with 13 no. irrigation gantries (twelve gantries spanning 12.8m, one gantry spanning 6.4m)
- Ebb and flood container transport system with water recirculation and treatment
- Environmental computer and feed rigs
- Fully automated sowing and harvesting with overhead cranes, transport cars, container washer
- Combi-matic shade and light pollution screens with vertical rolling up screens
- 10,000 lux supplementary lighting installation.
- HV electrical supply and mains diversion.
- Temperature controlled Work area with two cold stores, offices and staff facilities.
First phase due for completion Autumn 2005.